{"id":310,"date":"2021-11-04T20:04:06","date_gmt":"2021-11-04T20:04:06","guid":{"rendered":"https:\/\/m2-consulting.nl\/?p=310"},"modified":"2021-11-04T20:11:29","modified_gmt":"2021-11-04T20:11:29","slug":"case-nutricia-cuijk-closure-of-production-plant","status":"publish","type":"post","link":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/","title":{"rendered":"Case: Nutricia Cuijk &#8211; closure of production plant"},"content":{"rendered":"<h2><\/h2>\n<h2>Introduction<\/h2>\n<p>After more than a 100 years, Nutricia decided to close its \u2018old\u2019 production plant in Cuijk and build a new one, located in Haps. Nutricia\u2019s production activities are transferred from Cuijk to Haps in phases. When M2-Consulting joined Nutricia Cuijk, the production site in Haps was being ramped up, and the shifting of production from Cuijk to Haps had already been set in motion. The Cuijk location was gradually scaling down and shutting down production lines.<\/p>\n<h2>The Assignment<\/h2>\n<p>M2-Consulting was assigned as accounting manager in order to lead the accounting team (3 FTE). In addition to the day-to-day accounting activities, the month-end close and reporting, the team needed to be led towards the closure of the production plant, and the assignment included specific accounting tasks related to the closure of the Cuijk location.<\/p>\n<h2>Challenges<\/h2>\n<p>The assignment included challenges that were taken into consideration beforehand, but of course some unexpected events occurred.<\/p>\n<ol>\n<li>Team motivation<\/li>\n<\/ol>\n<p>First of all, the team should be prepared to work in a new context after the closure of the plant. Of the original 6 FTE, 3 FTE had already left the team due to a reduction in workload.<\/p>\n<ol start=\"2\">\n<li>Postponed closure<\/li>\n<\/ol>\n<p>Secondly, circumstances on the market changed during the assignment, resulting in a delay of the closure due to an increase of market demand. Naturally, this also impacted the challenge regarding the team\u2019s motivation.<\/p>\n<ol start=\"3\">\n<li>Implementing new WOW<\/li>\n<\/ol>\n<p>Thirdly, out of the original 5 production lines only 1 line was still open for production. As a result, tasks shifted within the team and reporting needs became less complex.<\/p>\n<ol start=\"4\">\n<li>Covid Impact<\/li>\n<\/ol>\n<p>Lastly, the Covid pandemic hit during this assignment. As a result, team members needed to work from home and manage the site remotely.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction After more than a 100 years, Nutricia decided to close its \u2018old\u2019 production plant in Cuijk and build a new one, located in Haps. Nutricia\u2019s production activities are transferred from Cuijk to Haps in phases. When M2-Consulting joined Nutricia Cuijk, the production site in Haps was being ramped up, and the shifting of production [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":311,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[10,5],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.10 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Case: Nutricia Cuijk - closure of production plant - M2 Consulting<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Case: Nutricia Cuijk - closure of production plant - M2 Consulting\" \/>\n<meta property=\"og:description\" content=\"Introduction After more than a 100 years, Nutricia decided to close its \u2018old\u2019 production plant in Cuijk and build a new one, located in Haps. Nutricia\u2019s production activities are transferred from Cuijk to Haps in phases. When M2-Consulting joined Nutricia Cuijk, the production site in Haps was being ramped up, and the shifting of production [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"M2 Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-04T20:04:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-04T20:11:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/m2-consulting.nl\/wp-content\/uploads\/M2Consulting_LC-97-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Eef\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eef\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/\",\"url\":\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/\",\"name\":\"Case: Nutricia Cuijk - closure of production plant - M2 Consulting\",\"isPartOf\":{\"@id\":\"https:\/\/m2-consulting.nl\/#website\"},\"datePublished\":\"2021-11-04T20:04:06+00:00\",\"dateModified\":\"2021-11-04T20:11:29+00:00\",\"author\":{\"@id\":\"https:\/\/m2-consulting.nl\/#\/schema\/person\/2a092fe907af392dccb1421ab2060962\"},\"breadcrumb\":{\"@id\":\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/m2-consulting.nl\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case: Nutricia Cuijk &#8211; closure of production plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/m2-consulting.nl\/#website\",\"url\":\"https:\/\/m2-consulting.nl\/\",\"name\":\"M2 Consulting\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/m2-consulting.nl\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/m2-consulting.nl\/#\/schema\/person\/2a092fe907af392dccb1421ab2060962\",\"name\":\"Eef\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/m2-consulting.nl\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f94d597da5062835822e6062e6bbd227?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f94d597da5062835822e6062e6bbd227?s=96&d=mm&r=g\",\"caption\":\"Eef\"},\"url\":\"https:\/\/m2-consulting.nl\/en\/author\/eef\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Case: Nutricia Cuijk - closure of production plant - M2 Consulting","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/","og_locale":"en_US","og_type":"article","og_title":"Case: Nutricia Cuijk - closure of production plant - M2 Consulting","og_description":"Introduction After more than a 100 years, Nutricia decided to close its \u2018old\u2019 production plant in Cuijk and build a new one, located in Haps. Nutricia\u2019s production activities are transferred from Cuijk to Haps in phases. When M2-Consulting joined Nutricia Cuijk, the production site in Haps was being ramped up, and the shifting of production [&hellip;]","og_url":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/","og_site_name":"M2 Consulting","article_published_time":"2021-11-04T20:04:06+00:00","article_modified_time":"2021-11-04T20:11:29+00:00","og_image":[{"width":2560,"height":1600,"url":"https:\/\/m2-consulting.nl\/wp-content\/uploads\/M2Consulting_LC-97-scaled.jpg","type":"image\/jpeg"}],"author":"Eef","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Eef","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/","url":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/","name":"Case: Nutricia Cuijk - closure of production plant - M2 Consulting","isPartOf":{"@id":"https:\/\/m2-consulting.nl\/#website"},"datePublished":"2021-11-04T20:04:06+00:00","dateModified":"2021-11-04T20:11:29+00:00","author":{"@id":"https:\/\/m2-consulting.nl\/#\/schema\/person\/2a092fe907af392dccb1421ab2060962"},"breadcrumb":{"@id":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/m2-consulting.nl\/en\/case-nutricia-cuijk-closure-of-production-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/m2-consulting.nl\/en\/"},{"@type":"ListItem","position":2,"name":"Case: Nutricia Cuijk &#8211; closure of production plant"}]},{"@type":"WebSite","@id":"https:\/\/m2-consulting.nl\/#website","url":"https:\/\/m2-consulting.nl\/","name":"M2 Consulting","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/m2-consulting.nl\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/m2-consulting.nl\/#\/schema\/person\/2a092fe907af392dccb1421ab2060962","name":"Eef","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/m2-consulting.nl\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f94d597da5062835822e6062e6bbd227?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f94d597da5062835822e6062e6bbd227?s=96&d=mm&r=g","caption":"Eef"},"url":"https:\/\/m2-consulting.nl\/en\/author\/eef\/"}]}},"_links":{"self":[{"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/posts\/310"}],"collection":[{"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/comments?post=310"}],"version-history":[{"count":3,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/posts\/310\/revisions"}],"predecessor-version":[{"id":316,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/posts\/310\/revisions\/316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/media\/311"}],"wp:attachment":[{"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/media?parent=310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/categories?post=310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/m2-consulting.nl\/en\/wp-json\/wp\/v2\/tags?post=310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}